Early Propping Support

  • Next Day Propping*

The Actech Early Propping Supports Provide a safe and cost effective way to prop panels in low strength concrete floors.

Simply locate the correct propping position and secure the base to the formwork soffit.

Cut M12 allthread to suit the finished height of the support.

CodeNamePack
50962012.DEF.ZR M20-M12 x 96 DEF Round Ferrule - Zinc 50
50962012.DEF.GR M20-M12 x 96 DEF Round Ferrule - Gal 50
50962012.BASE.G M20-M12 x 96 DEF Base - Gal 50

Load Rating of EPS

Concrete Strength 8 MPA 10 MPA 15 MPA 20 MPA 25 MPA 30 MPA 40 MPA
Tension 34.38 kN 38.44 kN 47.08 kN 48.00 kN** 48.00 kN** 48.00 kN** 48.00 kN**
Max Prop Load 39.70 kN 44.44 kN 54.63 kN 55.40 kN** 55.40 kN** 55.40 kN** 55.40 kN**
Max Prop Shear 19.85 kN 22.20 kN 27.18 kN 27.70 kN** 27.70 kN** 27.70 kN** 27.70 kN**

*‘Next Day Propping’ is subject to concrete achieving minimum strength
**The pull out capacity is limited by the capacity of ferrule.
WLL calculations based on FOS = 2.5