Early Propping System Range

NameCodeChemical TypeEffective DepthLengthMaterialStyleThreadThread-lengthType DescX-Hole 
M20-M12 x 96mm DEF Round Zinc Ferrule50962012.DEF.ZRDouble Ended Ferrule8096ZincRoundM20-M1212/M12 50/M20Double Ended Ferrule15Order
M20-M12 x 96mm DEF Round Gal Ferrule50962012.DEF.GRDouble Ended Ferrule8096HDGRoundM20-M1212/M12 50/M20Double Ended Ferrule15Order
M20-M12 x 96mm DEF BASE Gal50962012.BASE.GDouble Ended Ferrule-96HDGSquareM20-M12-Double Ended Ferrule-Order
M16-M12 x 96mm DEF Round SS316 Ferrule ex 24mm Bar50961612.DEF.S6RDouble Ended Ferrule8096SS316RoundM16-M1212/M12 50/M16Double Ended Ferrule15Order
M12 ZINC Allthread 3.6m551Z4M12-36---------Order
M12 ZINC Allthread 3.0m551Z4M12-30---------Order
M12 ZINC Allthread 1.0m551Z4M12-10---------Order
M12 HDG Allthread 3.0m551G4M12-30---------Order
M12 HDG Allthread 1.0m551G4M12-10---------Order
Early Propping Support Chair Base for M12 Thread49SCRM12-----M12---Order

Overview

The Actech Early Propping Support provides a safe and cost effective way to prop panels in low strength concrete floors. The Early Propping Support system is becoming essential in the present day due to the increasing demand for quick concrete pouring as well as the erection of these concrete slabs and other elements.

Consequently, Actech’s Early Propping System, helps to significantly save time and labour costs and ensures that your job is on track.

Simply locate the correct propping position and secure the base to the formwork soffit. Cut M12 allthread to suit the finished height of the support.

CodeNamePack
50962012.DEF.ZRM20-M12 x 96 DEF Round Ferrule – Zinc50
50962012.DEF.GRM20-M12 x 96 DEF Round Ferrule – Gal50
50962012.BASE.GM20-M12 x 96 DEF Base – Gal50

Load Rating of EPS

Concrete Strength8 MPA10 MPA15 MPA20 MPA25 MPA30 MPA40 MPA
Tension34.38 kN38.44 kN47.08 kN48.00 kN**48.00 kN**48.00 kN**48.00 kN**
Max Prop Load39.70 kN44.44 kN54.63 kN55.40 kN**55.40 kN**55.40 kN**55.40 kN**
Max Prop Shear19.85 kN22.20 kN27.18 kN27.70 kN**27.70 kN**27.70 kN**27.70 kN**

*‘Next Day Propping’ is subject to concrete achieving minimum strength
**The pull out capacity is limited by the capacity of ferrule.
WLL calculations based on FOS = 2.5

Specifications

SKU50962012.DEF.GR
Shipping Weight0.28 kg